Equipment Fabrication & Installation

Waste Heat Recovery Power Generation System

Hpa-an

2012

Fabrication and installation.

Crystallizer, Centrifuge, Evaporator, Neutralizer (Sugar Mill)

Taung Twin Gyee

2010

Installation of the components.

50 tons Rice Mill

Nay Pyi Taw

2007

Dismantled the old mill and reconstruct into a new one by fabricating the required components and installing them.

Bio Fuel Project

Hlegu

2006

Piping installation. Machine installation.

Boiler Installation, Classifier, Evaporator

Kanbalu

2001

Installation of the fabricated Thai design.

Raw Mill Installation (Cement Factory)

Hpa-an

2000

Install the fabricated design from Japan Company which assigned BPE as sub-division.