Process Piping & Industrial M&E Works

Cement Mill

Hpa-an

2012

Waste heat recovery power generating system. Large and small-bore piping.

PE Piping Installation

Myin Gyan

2008

A mile long PE pipe installation.

1000 Gal/Day Bio Fuel Project

MWDC, Hlegu

2005

Piping Installation and Machine Installation.

4000 TPD Cement Factory

Hpa-an

2000

The height of 90 m with Japanese design. Both fabrication and installation. Internal air piping.

2.5 Million Gallons Water Treatment Project

Hpa-an

2000

Pipelines installation for carrying and treating water from Thanlyin River to the cement factory in Myaing Kalay.