Equipment Fabrication & Installation

  • Waste Heat Recovery Power Generation System
  • Waste Heat Recovery Power Generation System
  • Waste Heat Recovery Power Generation System
  • Waste Heat Recovery Power Generation System
  • Waste Heat Recovery Power Generation System

Waste Heat Recovery Power Generation System

(Hpa-an)

  • Completed Year

    2012

  • Location

    Hpa-an

  • Duration

    1 year

  • Process

    Fabrication and installation.

  • Sugar Mill Project
  • Sugar Mill Project
  • Sugar Mill Project
  • Sugar Mill Project

Crystallizer, Centrifuge, Evaporator, Neutralizer (Sugar Mill)

(Taung Twin Gyee)

  • Completed Year

    2010

  • Location

    Taung Twin Gyee

  • Duration

    8 months

  • Process

    Installation of the components.

  • 50 tons Rice Mill
  • 50 tons Rice Mill
  • 50 tons Rice Mill

50 tons Rice Mill

(Nay Pyi Taw)

  • Completed Year

    2007

  • Location

    Nay Pyi Taw

  • Duration

    2 months

  • Process

    Dismantled the old mill and reconstruct into new one by fabricating required components and installing them.

  • Bio Fuel Project
  • Bio Fuel Project
  • Bio Fuel Project

Bio Fuel Project

(Hlegu)

  • Completed Year

    2006

  • Location

    Hlegu

  • Duration

    6 months

  • Process

    Piping installation. Machine installation.

  • Boiler Installation, Classifier, Evaporator
  • Boiler Installation, Classifier, Evaporator
  • Boiler Installation, Classifier, Evaporator

Boiler Installation, Classifier, Evaporator

(Kanbalu)

  • Completed Year

    2001

  • Location

    Hpa-an

  • Duration

    3 month

  • Process

    Installation of the fabricated Thai design.

  • Raw Mill Installation
  • Raw Mill Installation
  • Raw Mill Installation

Raw Mill Installation (Cement Factory)

(Hpa-an)

  • Completed Year

    2000

  • Location

    Hpa-an

  • Duration

    1 month

  • Process

    Install the fabricated design from Japan Company which assigned BPE as sub-division.

  • Hoisting Chimney
  • Hoisting Chimney

Hoisting Chimney (Sugar Mill Project)

(Oaktwin)

  • Completed Year

    1998

  • Location

    Oaktwin

  • Duration

    1 week

  • Process

    Fabricate and Install with design from China. Erect with two heavy cranes to reach 90 feets.

  • Evaporator Cup Fabrication
  • Evaporator Cup Fabrication
  • Evaporator Cup Fabrication

Evaporator Cup Fabrication (Sugar Mill Project)

(Oaktwin)

  • Completed Year

    1998

  • Location

    Oaktwin

  • Duration

    1 week

  • Process

    Fabrication and Installation of China imported equipment.