(Yangon)
2012
8mile (Yangon)
1 month
Provide design. Fabrication and Installation.
(Yangon)
2012
South Dagon Industrial Zone
1 month
Provide design, detailed drawing. Fabrication and Installation of Structure.
(South Dagon Industrial Zone)
2012
South Dagon Industrial Zone
1 and a half month
From detailed drawing design to construction stage.
(Bago)
2010
Bago
15 days
Fabrication and Installation of Columns and Roofs
(Dagon Seikkan)
2008
Dagon Seikkan
1 and a half month
From detailed drawing design to construction stage.
(Myingyan)
2007
No.1 Steel Mill (Myingyan)
1 year and 6 months
EPC project with Italy design. Structure, Piping and Machines installation.
(Hpa-An)
2001
Hpa-An
1 year and 6 months
4000 tons per day
Fabricate the required components with the designs provided by Japanese Colleagues. Structure, Piping and Machines installation.
(Kanbalu)
2000
Kanbalu
1 year
2000 tons per day
Collaboration with Thai company who provided designs. Structure installation. 1 million gallons tank fabrication.
(Yangon)
1999
Yangon
15 days
Fabrication and Installation
(Oak Twin)
1998
Oak Twin
8 month
2000 tons per day
Structure, pipings and machines installation
(Yangon)
1997
Pazaung Taung (Yangon)
4 months
Provide design and continue fabrication and installation for 400 tons storage
(Yangon)
1997
Yangon
3 months
Fabrication and Installation
(Yangon)
1997
Yangon
3 months
Installation of the fabricated components
(University of Agriculture - Yezin)
1997
University of Agriculture (Yezin)
1 month
Fabrication and Installation
(Yangon)
1996
Yangon
6 months
Installation and erection of the imported parts and equipment.
(Yangon)
1996
Yangon
6 months
Fabricate and Install the components which are designed by Japan Company (Hazama Ando Corporation)
(Yangon)
1996
Migalardon (Yangon)
1 year
Fabricate the required components and install them.