Process Piping & Industrial M&E Works

  • Cement Mill
  • Cement Mill

Cement Mill

(Hpa-an)

  • Completed Year

    2012

  • Location

    Hpa-an

  • Duration

    8 months

  • Process

    Waste heat recovery power generating system. Large and small-bore piping.

  • PE Piping Installation
  • PE Piping Installation
  • PE Piping Installation
  • PE Piping Installation
  • PE Piping Installation
  • PE Piping Installation

PE Piping Installation

(Myin Gyan)

  • Completed Year

    2008

  • Location

    No.1 Steel Mill(Myan Gyan)

  • Duration

    2 months

  • Process

    A mile long PE pipe installation.

  • 4000 TPD Cement Factory
  • 4000 TPD Cement Factory
  • Internal Air Piping

1000 Gal/Day Bio Fuel Project

(MWDC, Hlegu)

  • Completed Year

    2005

  • Location

    Hlegu

  • Duration

    6 months

  • Process

    Piping Installation and Machine Installation.

  • 2.5 million gallons water treatment project
  • 2.5 million gallons water treatment project

2.5 Million Gallons Water Treatment Project

(Hpa-an)

  • Completed Year

    2000

  • Location

    Hpa-an

  • Duration

    1 and a half month

  • Process

    Pipelines installation for carrying and treating water from Thanlyin River to the cement factory in Myaing Kalay.

  • 4000 TPD Cement Factory
  • 4000 TPD Cement Factory
  • Internal Air Piping
  • Internal Air Piping

4000 TPD Cement Factory

(Hpa-an)

  • Completed Year

    2000

  • Location

    Hpa-an

  • Duration

    1 month

  • Process

    The height of 90 m with Japanese design. Both fabrication and installation. Internal air piping.